Z Energy New Plymouth

Z_Energy_Tanks_Wide.jpg


 
 Z ENERGY NEW PLYMOUTH TANK DECOMMISSIOINING

Project Overview

Nikau Contractors was engaged to deliver the controlled demolition and environmental remediation of the former Z Energy Tank Farm located in New Plymouth. This coastal industrial site presented a complex scope involving large steel storage tanks, tight operational constraints, and hydrocarbon-impacted soils.

The project required a safe, efficient, and environmentally responsible approach to dismantling fuel infrastructure while ensuring the site was remediated and left ready for future redevelopment.

Nikau's Project Approach and Solutions

Nikau applied proven heavy-industrial demolition methodologies, combining specialist plant, experienced operators, and robust environmental controls. Key elements of the works included:

Tank Farm Demolition:

The steel storage tanks were progressively dismantled using mechanical demolition techniques, allowing for precise control of collapse sequences and material handling.

Specialist Demolition Plant:

Works were undertaken using:

  • 50-tonne excavator fitted with hydraulic shears for cutting and processing heavy steel plate and structural members.

  • 50-tonne excavator equipped with demolition grapples and lifting magnets for efficient handling, separation, and loading of ferrous materials.

Steel Recovery and Recycling:

All recovered steel was segregated and processed on site, with a total of 500 tonnes of ferrous material removed and sent for recycling, supporting circular-economy outcomes.

Hydrocarbon Soil Remediation:

Contaminated soils impacted by historical fuel operations were carefully excavated, managed, and remediated in accordance with environmental requirements, ensuring protection of surrounding land and waterways.

Environmental Controls:

Appropriate dust suppression, runoff management, and site-specific environmental controls were maintained throughout the works to minimise off-site impacts, particularly given the site’s proximity to the coastline.

Contractor Responsibilities

  • Controlled demolition of steel fuel storage tanks

  • Operation of 50-tonne excavators with hydraulic shears, grapples, and magnets

  • Recovery and recycling of 500 tonnes of ferrous steel

  • Excavation and remediation of hydrocarbon-contaminated soils

  • Implementation of environmental and safety controls throughout the project

     

Nikau’s delivery of the Z Energy Tank Farm demolition demonstrates our capability in complex industrial deconstruction and contaminated-site remediation. Through careful planning, specialist equipment, and a strong focus on sustainability, the project was completed safely, efficiently, and with minimal environmental impact.

For further information on this project or to discuss upcoming industrial demolition or remediation works, please contact Nikau Contractors directly.